2-52 PERIODIC MAINTENANCE
Maintenance Procedure
Radiator Hose and O-ring Replac ement
•
Drain the coolant (see Coolant Change).
•
Remove:
Lower Fairings (see Lower Fairing Removal in the Frame
chapter)
Middle Fairings (see Middle Fairing Removal in the
Frame c hapter)
Throttle Body Assembly (see Throttle Body Assembly
Removal in the Fuel System (DFI) chapter)
Thermostat Housing [A] (see Thermostat Housing Re-
moval in the Cooling System chapter)
Oil Cooler [B] (see Oil Cooler Removal in the Engine
Lubrication System chapter)
Water Pump [C] (see Water Pump Removal in the Cool-
ing System chapter)
Fitting [D]
Hoses [E]
O-rings [F]
•
Apply grease to the new O-rings and install them.
•
Instal the new hoses and tighten the clamps securely.
Torque - Radiator Hose Clamp Screws: 2.0 N·m (0.20 kgf·m,
18 in·lb)
•
Fill the coolant (see Coolant Change).
•
Check the cooling system for leaks.
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com