APPENDIX 17-19
Cable, Wire, and Hose Routing
1. Install the air switching valve after installing the heat insulation rubber plate.
2. Throttle Body Assy
3. Hang down the shaded portions of the heat insultaion rubber plate.
4. For Left Engine Bracket Bolt
5. For Radiator
6. For Air Suction Valve Covers and Stick Coils
7. For Right Engine Bracket (Cylinder Head Side)
8. For Throttle Body Holders
9. Set the projection into the hole.
10. For Right Front Engine Mount
11. C rankshaft Sensor Lead
12. Through the water hose under the heat insulation rubber plate.
13. For Middle Engine Mount
14. For Breather Tube
15. For Camshaft Sensor Lead
16. Alternator Lead
17. Gear Position Switch Lead
18. For Thermostat Case
19. For Water Temperature Sensor
20. Through the starter motor cable under the water hose.
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com