APPENDIX 17-27
Cable, Wire, and Hose Routing
1. Front
2. To the Fuel Tank
3. Hose (Blue)
4. Hose (Red)
5. Hose (White)
6. To the fitting of the Throttle Body #3 (Run the hose over the subthrottle valve actuator connector.)
7. Hose (Green)
8. To the fitting of the Throttle Body #4 (Run the hose under the harness.)
9. Bolt
10. Clamp
11. Band
12. Canister
13. Bracket
14. Face the point mark (white) to the right.
15. Bolt
16. Right Inner Fairing
17. Nut
18. Run the hoses inside the engine bracket.
19. Separator
20. Bracket
21. Run the white hose to the forward.
22. Run the red hose to the rearward.
23. Install the clamps as shown illustration noting to the direction of clip.
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com