FINAL DRIVE 11-9
Drive Chain
○
Install the link plate so that the gold painted [A] faces out.
○
Fit the link plate [A] in the pressure holder [B].
○
Fit the link plates of the chain into the wedge holder and
wedge pin [D].
○
Turn the pressure bolt (A) [C] by hand until link plate
touches the link pins.
○
Install the handle lever [A] onto the pressure bolt (A) [B].
○
Turn the handle lever, press in the link plate to the link
pins.
•
Set the adjuster bolt (yellow) [A], guide plate [B], and flare
pin [C] on the body.
•
Apply grease to the tip [D] of the flare pin.
•
Fit the adjuster bolt (yellow) to the link pin [E].
○
Install the grip lever [A] onto the pressure bolt (A) [B].
○
Stake the link pin end by the handle lever about 9/10 turns
[C].
○
Repeat the above steps for other link pin [D].
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com