FRAME 15-11
Fairings
Windshield Installation
•
Put the front tongue [A] into the hollow [B].
Torque - Windshield Mounting Bolts: 0.4 N·m (0.04 kgf·m,
4in·lb)
Upper Fairing Removal
•
Remove:
Lower Fairings (see Lower Fairing Removal)
Upper Inner Fairings (see Upper Inner Fairing Removal)
Windshield (see Windshield Removal)
Middle Fairings (see Middle Fairing Removal)
Bolts [A]
Meter Lead Connector [B]
•
Disconnect the headlight lead connectors [A] and city light
lead connectors [B] (Left and Right).
•
Remove the upper fairing.
○
Pull out the upper fairing forward.
Upper Fairing Disassembly
•
Remove:
Center Inner Fairing (see Center Inner Fairing Removal)
Nuts [A]
Screws [B]
Clamp [D]
Rear View Mirrors (Left and Right)
Meter Unit [C] with bracket (see Meter Unit Removal in
the Electrical System chapter)
Headlight (see Headlight Removal in the Electrical Sys-
tem chapter)
Upper Fairing Assembly
•
Install the removed parts (see appropriate chapters).
Upper Fairing Installation
•
Install the removed parts (see appropriate chapters).
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com