14-14 STEERING
Handlebar
•
Install the left and right switch housings.
○
Fit the projection [A] into a small hole [B] in the handlebar.
Torque - Handlebar Switch Housing Screws: 3.5 N·m (0.36
kgf·m, 31 in·lb)
•
Connect the front brake light switch connector.
•
Install the clutch lever [A] so that the m ating surface [B]
of the clutch lever clamps with punch mark [C] on the
handlebar.
•
Install:
Throttle Grip
Throttle Cable Tips [A]
Throttle Cases [B]
○
Fit the projection [C] into a small hole [D] in the handlebar.
•
Tighten:
Handlebar Weights
•
Install the removed parts (see appropriate chapters).
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com