Kawasaki ZX-10R Automobile User Manual


 
5-42 ENGINE TOP END
Muffler
Middle an d Rear Exha ust Pipe Installation
Replace the middle exhaust pipe gasket [A] with a new
one.
Install the middle exhaust pipe gasket until it is bottomed
so that the chamfer side (inner) faces front exhaust pipe
[B].
Install the middle exhaust pipe [C].
Tighten:
Torque - Middle Exhaust Pipe Stay Bolt [D]: 25 N·m (2.5
kgf·m, 18 ft·lb)
Install the middle exhaust pipe clamp bolt [E] as shown.
Upside [F]
Outside [G]
35° 55° [H]
Front View [I]
Tighten:
Torque - Middle Exhaust Pipe Clamp Bolt: 17 N·m (1.7
kgf·m, 13 ft·lb)
Replace the rear exhaust pipe gasket [J] with a new one.
Install the rear exhaust pipe gasket until it is bottomed so
that the chamfer side (outer) faces rear exhaust pipe [K].
Install the rear exhaust pipe clamp bolt [L] as shown.
Fit the projection [M] of the rear exhaust pipe into the slot
[N] in the clamp.
Install the rear exhaust pipe.
Fit the damper [O] of the rear exhaust pipe into the stopper
[P] of the middle exhaust pipe.
Install the left and right muffler body (see Muffler Body
Installation).
Tighten:
Torque - Rear Exhaust Pipe Clamp Bolt: 17 N·m (1.7 kgf·m,
13 ft·lb)
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com