8-8 ENGINE REMOVAL/INSTALLATION
Engine Removal/Installation
•
Using the nut wrench [A], loosen the locknut [B].
Special Tool - Engine Mount Nut Wrench: 57001-1450
•
Using the Hexagon Wrench, turn the adjusting collar [A]
counterclockwise to make the gap between the engine
and adjusting collar.
•
Remove the drive chain [A] from the output shaft [B].
•
Using the stand, take out the engine.
Engine Installation
•
Support the engine with a suitable stand.
○
Put a plank onto the suitable stand for engine balance.
•
Install the heat insulation rubber plate onto the engine as
shown.
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com