ENGINE REMOVAL/INSTALLATION 8-9
Engine Removal/Installation
A: White Mark
B: To Radiator
C: To Right Engine Bracket (Cylinder Head
Side)
D: Through the left engine bracket bolt.
E: To Camshaft Position Sensor Lead
F: To Air Suction Valve Cover and Stick Coil
G: To Throttle Body Assy Holder
H: Right Front Engine Mount
I: To Thermostat Case
J: To Water Temperature Sensor
K: Crankshaft Sensor Lead
L: Through the water hose under the heat insu-
lation rubber plate
M: Through the starter motor cable under the
water hose.
N: Gear Position Switch/Water Temperature
Sensor Lead (Harness).
O: Alternator Lead
P: To Breather Tube and Middle Engine Mount
Q: After installation, set the projection in the hole
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com