Kawasaki Z750 Camper User Manual


 
ENGINE REMOVAL/INSTALLATION 8-9
Engine Removal/Installation
Tenth, temporarily install:
Front E ngine Bracket [C]
Right Upper Engine Mounting Bolt [A]
Front Engine B racket Bolts [B]
Eleventh, tighten the right upper engine mounting bolt.
Lastly, tighten the front engine bracket bolts.
Torque - Right U pper E ngine Mounting Bolt : 44 N·m (4.5
kgf·m, 33 ft·lb)
Front Engine Bracket Bolts: 44 N·m (4.5 kgf·m, 3 3
ft·lb)
Run the leads, cables and hoses correctly (see Cable,
Wire and Hose Routing section in Appendix chapter).
Install the removed parts (see appropriate chapters).
Adjust:
Throttle Cables (see Fuel System (DFI) chapter)
Choke Cable (see Fuel System (DFI) chapter)
Clutch Cable (see Clutch chapter)
Drive Chain (see Final Drive chapter)
Fill the engine with engine oil (see Engine Lubrication
System in the Periodic Maintenance chapter).
Fill the engine with coolant (see Cooling System in the
Periodic Maintenance chapter).