Kawasaki Z1000 Motorcycle User Manual


 
ENGINE REMOVAL/INSTALLATION 8-11
Engine Removal/Installation
Ninth, temporarily install:
Front Engine Bracket [A]
Front Right Engine Mounting Bolt [B]
Tenth, tighten the rear bracket bolts.
Torque - Rear Engine Bracket Bolts: 25 N·m (2.5 kgf·m, 18
ft·lb)
Eleventh, tighten securely:
Middle Engine Mounting Nut
Lower Engine Mounting Nut
To
rque -
En
gine Mounting Nut: 44 N·m (4.5 kgf·m, 32 ft·lb)
Twelfth, tighten the right upper engine mounting bolt.
Lastly, tighten the front bracket bolts.
Torque - Right Upper Engine Mounting Bolt : 44 N·m (4 .5
kgf·m, 32 ft·lb)
Front Bracket Bolts: 44 N·m (4.5 kgf·m, 32 ft·lb)
Run the leads, cables and hoses correctly (see Cable,
Wire and Hose Routing section in Appendix chapter).
Install the removed parts (see appropriate chapters).
Adjust:
Throttle Cables (see Periodic Maintenance chapter)
Choke Cable (see Fuel System (DFI) chapter)
Clutch Cable (see Periodic Maintenance chapter)
Drive Chain (see Periodic Maintenance c hapter)
Fill the engine with engine oil (see Periodic M aintenance
chapter).
Fill the engine with coolant and bleed the air from the
cooling system (see Periodic Maintenance chapter).