15-36 ELECTRICAL SYSTEM
Starter Circuit
.Remove the junction box (see Fuse Removal).
.Check conductivity of the following numbered terminal
by connecting the hand tester (special tool) and one
12 V battery to the junction box as shown.
*If the relay does not work as specified. replace the
junction box.
Relay Circuit Inspection
(with the battery disconnected)
Meter Reading
Meter Connection
11 -13
00
12- 13
00
Relay Circuit Inspection
( with the battery connected )
Battery
Connection
+
Meter
Reading
(0)
Meter
Connection
11 -13
11 -12
0
Diode Circuit Inspection
.Remove the junction box from the motorcycle.
.Pull off the connectors from the junction box.
.Check conductivity of the following pair of terminals.
Terminals for Diode Circuit Inspection
14-12.14-15.14-16
*The resistance should be low in one direction and more
than ten times as much in the other direction. If any
diode shows low or high in both directions, the diode
is defective and the junction box must be replaced.
NOTE
0 The actual meter reading varies with the meter used and
the individual diodes, but generally speaking, the lower
reading should be from zero to one half the scale.