Cisco Systems AT10.1 Automobile Battery Charger User Manual


 
INSTALLING THE AT10.1
6
1.5.2. Floor-Mounting the AT10.1
To floor mount the AT10.1, you must use the floor mounting accessory kit
(part number EI0192-00). For kit availability, see ordering information in
Appendix B on page 71. The kit contains brackets that elevate the top of
the AT10.1 approximately 47in / 1194mm above floor level, with
provision for floor anchoring. The kit includes an instruction sheet
(JA0083) showing assembly dimensions and mounting details.
You must locate the anchor-bolt holes at least 4.25in / 108mm from any
wall, to allow clearance for the charger enclosure behind the mounting
brackets. In addition, you must consider the following:
1. Placement of conduit entrances (use the knockouts on the sides or bottom of
the charger to allow access for servicing without removing the unit from the
mounting brackets).
2. The location:
Should be free of drips and splatter. If dripping liquids are a problem,
install a drip shield kit (part number EI0191-00). For kit availability, see
ordering information in Appendix B on page 71.
Should be between 32 and 122 °F / 0 and 50 °C, with relative humidity
between 5 and 95% non-condensing.
Must be free of explosive materials.
3. Maintain at least 6in / 152mm of free air on top, bottom and both sides for
cooling air.
4. Allow 36in / 914mm front clearance for operation and maintenance.
PROCEDURE
To floor-mount the AT10.1,
follow the directions featured in
instruction sheet (JA0083),
included with your floor-
mounting kit (part number
EI0192-00). These instructions
showing assembly dimensions
and mounting details.
Place the AT10.1 assembly on
the mounting bolts, add
appropriate mounting hardware
and tighten.
Reference the graphics on the
next page.