Nilfisk-ALTO RS 2200 Automobile User Manual


 
ENGLISH
USER MANUAL
34
33019476(3)2010-02 A RS 2200
MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
The following table provides the scheduled maintenance. The intervals shown may vary according to particular working conditions,
which are to be de ned by the person in charge of the maintenance.
WARNING!
To perform maintenance procedures turn off the machine (remove the ignition key) and turn the battery release
switch (37, Fig. G) to OFF (see Fig. X).
Moreover, read carefully the instructions in Safety chapter before performing any maintenance procedure.
WARNING!
When performing maintenance procedures which require hopper lifting, the support rod (1, Fig. M) must be
engaged. See the procedure in Hopper Support Rod Installation paragraph.
CAUTION!
Do not perform maintenance procedures when the machine lifting device is activated (leaf springs at the end of
stroke).
NOTE
When performing maintenance procedures, use only original spare parts.
NOTE
The display (32, Fig. E) is programmed to show an expired or nearly expired maintenance by means of the symbol
.
Maintenance must be performed at 150 and 500 hours (see Display Functions paragraph).
All scheduled or extraordinary maintenance procedures must be performed by quali ed personnel, or by an authorised Service
Center.
This Manual contains the Scheduled Maintenance Table and describes only the easiest and most common maintenance
procedures.
For other maintenance procedures contained in the Scheduled Maintenance Table or for extraordinary maintenance procedures see
the Service Manual that can be consulted at any Service Center.
SCHEDULED MAINTENANCE TABLE
Maintenance
Long
periods
After
every
use
Every
40
hours
Every
150
hours
Every
200
hours
Every
300
hours
Every
500
hours
Every
800
hours
Every
1,000
hours
Every
1,500
hours
Engine oil level check
Brake uid level check
Hydraulic system oil level check
Engine coolant level check
Engine air lter cleaning
Air lter cyclone block cleaning
Particulate lter cleaning
Particulate lter regeneration (9)
Engine air lter replacement
Combined radiator n check
Combined radiator n cleaning
Coolant line check (6)(7)
Engine cylinder head tightening (2)