Emerson 3812 Automobile Parts User Manual


 
32 Meter safety for hoist rings and lifting slings
Section 2: Mechanical installation Daniel 3812 Liquid Ultrasonic Flow Meter Installation Manual
March 2013 3-9000-765 Rev D
2.3 Meter safety for hoist rings and lifting slings
A Daniel Ultrasonic Meter can be safely lifted and maneuvered into and out of a meter run for
installation or service by obeying the following instructions.
DANGER TO PERSONNEL AND EQUIPMENT
Lifting a Daniel Ultrasonic Meter with other equipment
The following lifting instructions are for installation and removal of the Daniel Ultrasonic
Meter ONLY. The instructions below do not address lifting the Daniel ultrasonic meter while it
is attached, bolted, or welded to meter tubes, piping, or other fittings.
Using these instructions to maneuver the Daniel Ultrasonic Meter while it is still attached,
bolted, or welded to a meter tube, piping, or other fitting may result in equipment damage,
serious injury, or death.
The operator must refer to their company's hoisting and rigging standards, or the "DOE-STD-
1090-2004 Hoisting and Rigging" standard if such company standards do not exist, for lifting
and maneuvering any assembled meter tube and associated piping.
CRUSHING HAZARD
During meter installation or removal, always place the unit on a stable platform or
surface that supports its assembled weight.
Failure to do so could allow the meter to roll, resulting in serious injury or equipment damage.
Prior to lifting the unit, refer to the Daniel 3812 Liquid Ultrasonic Flow Meter nameplate or
outline dimensional (general arrangement) drawing for the assembled weight.