96 Security seals for the meter
Section 4: Configuration Daniel 3812 Liquid Ultrasonic Flow Meter Installation Manual
March 2013 3-9000-765 Rev D
4.5 Security seals for the meter
For the integrity of the meter metrology and to prevent tampering with the transmitter
electronics and transducer assemblies, attach security latches to the Shroud covering the
transducer assemblies and install security wires on the Transmitter Electronics Enclosure end
caps, the Base Enclosure hex head bolts, the Shroud clamps and the shroud latches
(see Section 3.7).
Pour the conduit ports sealing compound according to the customer’s requirements (e.g., after
appro
ximately one to two weeks of run time). Also, see Section 3.4.1 and see Section 3.4.2.