Appendix A: Commissioning Checklist
March 2015
Commissioning Checklist
A.2 Echo tuning
A.3 Backups and plots
Completed Not completed
For more information see Section: “Complete the advanced configuration” on page 7 and
“Review echo curve” on page 10l.
Configuration tool used:
RRM/RCT 475 DD (AMS) DTM - specify host:
Software version:
Firmware version:
Thresholds set at an appropriate level
YES NO
Possible false echoes properly
registered (non-contacting only)
YES NO
Trim Near Zone done (guided wave radar only)
YES NO
Probe End Projection properly activated (guided
wave radar only)
YES NO N/A
UNZ configured
YES NO N/A
Echo amplitude and Signal-to-Noise Ratio OK
YES NO
Transmitter measurement and data in the
expected range
YES NO
Completed Not completed
For more information see section: “Archive files” on page 14.
Initial backup taken and enclosed
YES NO
Final backup taken and enclosed
YES NO
Initial plots taken and enclosed
YES NO
Final plots taken and enclosed
YES NO
Trends from DCS taken and enclosed
YES NO N/A