Emerson 5300 Radar Detector User Manual


 
43
Reference Manual
00809-1600-4530, Rev AA
Appendix A: Commissioning Checklist
March 2015
Commissioning Checklist
A.1.3 Mechanical installation
Completed Not completed
Common
Mounting type:
Pipe/chamber Nozzle Direct/bracket
Nozzle diameter:
Nozzle height:
Nozzle orientation (position on tank, angled, vertical, horizontal, etc.):
Is the still pipe/chamber (when applicable) smooth
on the inside and without intruding welds, burrs,
etc.?
YES NO N/A
Proper cable glands in place
YES NO
Cable glands properly tightened
YES NO
Are the plastic protective plugs removed from all
unused cable entries and metal blanking plugs
fitted and tightened?
YES NO
Transmitter head - antenna/probe connection dry
and tightened
YES NO
Gaskets properly in place
YES NO N/A
Visual inspection of the radar installation
YES NO
Is the nozzle properly insulated (if applicable e.g.
hot product)?
YES NO N/A
Probe clearance to wall/disturbing object(s) OK
YES NO
Probe end anchored/grounded
YES NO
Nozzle size within stated limits
YES NO
If DVC: DVC conditions fulfilled
YES NO N/A