2 - 24
SPEC
CABLE ROUTING DIAGRAM
1
CDI unit
2
Hot starter cable
3
Throttle cable (return)
4
Throttle cable (pull)
5
Ignition coil
6
Radiator breather hose
7
Radiator hose 4
8
Cylinder head breather hose
9
CDI unit bracket
0
CDI unit band
È
Pass the hot starter cable and
throttle cables through the cable
guides.
É
Pass the hot starter cable over
the top radiator mounting boss.
Ê
Pass the hot starter cable and
throttle cables between the radi-
ator and frame, then over the
middle radiator mounting boss.
Ë
Pass the throttle cables on the
outside of the ignition coil.
Ì
Pass the carburetor breather
hose (throttle cable cover)
through the hose holder.
Í
Pass the radiator breather hose
at the rear of the radiator, on the
left of the chassis, and then
between the frame and radiator
hose 4.
Î
Insert the CDI unit band over the
CDI unit bracket as far as possi-
ble.
Ï
First install the CDI unit and CDI
unit band to the CDI unit
bracket, then the CDI unit
bracket to the frame.
8
7
6
1
0
9
1
2
3
4
Í
B
A
A
B
Î
Ï
É
Ì
È
Ê
Ë
5