Leica GPS1200 GPS Receiver User Manual


 
Operation GPS1200 61
10. Check that the tribrach is still level and note it down in the field record
sheet.
11. Measure the antenna height and note it down in the field record sheet.
)
If the tribrach is not level or the antenna height has changed, the collected
data is not reliable.
12. SHIFT QUIT (F6) to return to from where SURVEY Survey: Job Name
was accessed.
13. ESC until in GPS1200 Main Menu.
14. GPS1200 Main Menu
PROG plus USER to turn off the receiver.
15. Take down the equipment and put it back into the transport container.
16. Are more points to be surveyed?
•If yes, continue with step 17.
•If no, continue with step 19.
17. Move to the next point.
18. Repeat steps 1. to 16.
Step Description