Conair UGR004/1200 Automobile Parts User Manual


 
UGR004/1200 Moducon Belt Conveyor
INSTALLATION 3-3
PREPARING FOR
INSTALLATION
Plan the location. Make sure the area where the belt conveyor
is installed has the following:
A grounded power source. The belt conveyor
requires single phase, 100-115V, 50/60 Hz. All wiring
should be completed by qualified electrical technicians
and should comply with your region’s electrical codes.
Clearance for safe operation and maintenance.
Make sure there is enough clearance around the con-
veyor for safe operation, maintenance and servicing.
We recommend maintaining at least 24 inches
(510mm) around all sides of the conveyor.
Perform the installation in the following order:
Move the conveyor into position and adjust the level-
ing devices on the legs (or lock the optional casters).
Adjust the height of the legs so that the conveyor belt
is at the proper height for your needs.
Connect the conveyor to the power source.
Adjust the belt speed.
24 inches
(610 mm)
24 inches
(610 mm)
24 inches
(610 mm)
24 inches
(610 mm)