4G1 ENGINE (E-W) -
Cylinder Head and Valves
11A-9-10
PWEE9520
E
Nov. 1995Mitsubishi Motors Corporation
(4) Tighten the bolts in the sequence shown until each is
torqued to 49 Nm.
(5) Completely loosen the bolts.
(6) Retighten the bolts in the sequence shown until each is
torqued to 20 Nm.
(7) Apply paint marks to the cylinder head bolt heads and
cylinder head as shown.
(8) In accordance with the tightening sequence, tighten each
bolt by 90
_
.
(9) Tighten each bolt by a further 90
_
and check that the
paint marks on the bolt head and cylinder head are aligned.
Caution
If the bolts are tightened by an angle of less than
90
_
, they may not hold the cylinder head with sufficient
strength.
If the bolts are tightened by an angle exceeding 90
_
,
completely remove them and carry out the installation
procedure again.
PWEE9520-A
E
Dec. 1998Mitsubishi Motors Corporation Added
Timing belt side
1386 9
2510 4 7
90
_
Paint mark
90
_