DKS Enterprises 9310 Automobile Parts User Manual


 
SECTION 2 – WIRING
Before attempting to connect any wiring to the operator, be sure that the circuit breaker in the
electrical panel is in the OFF position. A separate power disconnect must be installed at the
operator location. Permanent wiring must be installed to the operator as required by local electrical
codes. It is recommended that such work be performed by a licensed electrical contractor.
2.1 Conduit Requirements
Since building codes vary from city to city, we highly recommend that you check with your
local building department prior to installing any permanent wiring to be sure that all wiring to
the operator (both high and low voltage) complies with local code requirements.
THIS GATE OPERATOR MUST BE PROPERLY GROUNDED!!
1
2
3
4 45 5
Not shown in drawing:
1. Secondary entrapment prevention device(s).
1
High Voltage Supply
2
3
4
Lead-in wire(s) from loop(s).
5
Low Voltage Control Wiring
Master / slave interface cable (not supplied).
A separate power disconnect MUST be installed at the operator location
DOORKING, INC., INGLEWOOD, CA 90301
Title:
Date: Rev.Dwg. No.
Conduit Requirements
B
5/05 M9310-065-1
The conduit requirements shown are for a typical slide gate operator installation (the slave
operator is shown for those applications where a slave operator may be used). The conduit
requirements for your application may vary from this depending on your specific needs.
Use only sweeps for conduit bends. Do not use 90° connectors as this will make wire pulls
very difficult and can cause damage to wire insulation.
Use separate conduits for high and low voltage.
We suggest that minimum ¾-inch conduit be used.
Be sure that all conduits are installed in accordance with local codes.
21