Buhler 2500 Automobile Accessories User Manual


 
bühler
2500 Hayliner
12
3. Carrier Control Operation
To begin 2500 Bale Carrier operation engage the remote hydraulic valve in the
extension position. Lock valve in detent. Valve to remain constantly on during
operation.
The control handle is fitted with one (1) rocker switch and four (4) momentary
contact rocker switches. They function as follows:
o PUSHER SPEED: Select (HIGH) to operate
pusher motors in series at high speed or
(LOW) to operate in parallel at low speed. Torque
is increased at low speed and pushes bales with
more force.
o RH PUSHER: Depress and hold RH PUSHER
FWD to move right forward. Depress and hold RH
PUSHER BACK to move right pusher back.
o
LH PUSHER: Depress and hold LH PUSHER
FWD to move left pusher forward. Depress and
hold LH PUSHER BACK to move left pusher
back
.
o RH LIFT ARM: Depress and hold RH LIFT ARM
UP to raise right lift arm. Depress and hold RH
LIFT ARM DN to lower right lift arm.
o LH LIFT ARM: Depress and hold LH LIFT ARM
UP to raise left lift arm. Depress and hold LH LIFT
ARM DN to lower left lift arm.
To operate raise / lower tilt function engage the remote hydraulic valve in the
extension position to raise the tilt deck and engage the retract position to lower
the deck.
4. Loading Bales
WARNING
Make sure area is clear before lowering bale lift arms. Failure
to do so could result in injury or death.
The right bale lift arm is used to load bales onto the right side of the carrier while
the left bale lift arm is used to load bales onto the left side of the carrier.
Align the tractor and 2500 Bale Carrier as indicated in the pictoral for pick up
method used. Slowly approach the bale at 5 mph (8 km/h) while loading. When
bale is properly captured begin to raise the bale.
To balance the 2500 Bale Carrier, alternate bale picking sides.
The 2500 Bale Carrier is designed to load bales with one of three options. Refer
to the appropriate section on the next page for your option loading instructions.
Instructions for the fork positions are provided in appendix A.
NOTE:
Before loading bale the pusher must be at the front of the carrier deck.
CONTROL
HANDLE
PUSHER
SPEED
RH PUSHER FWD
RH PUSHER BACK
LH PUSHER FWD
LH PUSHER BACK
RH LIFT ARM UP
RH LIFT ARM DN
LH LIFT ARM UP
LH LIFT ARM DN