ENGINE <4G6> -
Engine Assembly
11A-33
ENGINE ASSEMBLY
11200090015
REMOVAL AND INSTALLATION
Pre-removal Operation
D Fuel Discharge Prevention (Refer to GROUP 13A
- On-vehicle Service.)
D Engine Coolant Draining
D Thermostat Case Assembly Removal (Refer to
GROUP 14 - Water Hose and Water Pipe.)
D Front Exhaust Pipe Removal(Refer to GROUP15.)
D Hood Removal (Refer to GROUP 42.)
D Under Cover Removal
D Radiator Assembly Removal(Refer to GROUP14.)
D Air Cleaner Removal
Post-installation Operation
D Thermostat Case Assembly Installation (Refer to
GROUP 14 - Water Hose and Water Pipe.)
D Engine Coolant Supplying
D Accelerator Cable Adjustment (Refer to GROUP
17 - On-vehicle Service.)
D Front Exhaust Pipe Installation (Refer to GROUP
15.)
D Hood Installation (Refer to GROUP 42.)
D Under Cover Installation
D Radiator Assembly Installation (Refer to GROUP
14.)
D Air Cleaner Installation
O-ring
Delivery pipe
Engine oil
1
2
3
4
5
6
7
8
9
10
11
10
12
Removal steps
1. Accelerator cable connection
2. Vacuum hose connection
3. Brake booster vacuum hose con-
nection
4. Vacuum hose connection
5. Throttle position sensor connector
6. Idle speed control connector
7. Injector connector
8. Purge control solenoid valve con-
nector
9. EGR solenoid valve connector
"
D
A
10. High-pressure fuel hose connection
11. Fuel return hose connection
12. PCV hose connection