Garmin SR20 GPS Receiver User Manual


 
Cirrus Perspective
®
by Garmin – Cockpit Reference Guide for the SR20/SR22
190-00821-03 Rev. A
Appendix
104
Flight
InstrumentsEIS
Nav/Com/
XPDR/AudioAFCSGPS Nav
Flight
PlanningProcedures
Hazard
Avoidance
Additional
Features
Abnormal
Operation
Annun/
AlertsAppendixIndex
performing the database synchronization.
Synchronizing Databases
1)
Remove the MFD database card from the bottom card slot of the MFD.
2)
Update the Garmin databases on the MFD card.
3)
Insert the MFD database card into the bottom card slot of the MFD.
4)
Apply power to the system, check that the databases are initialized
and displayed on the power-up screen. When updating the terrain and
FliteCharts databases, an ‘in progress’ message may be seen. If this
message is present, wait for the system to finish loading before proceeding
to step 5.
5)
Acknowledge the Power-up Page agreement by pressing the ENT Key or
the right most softkey.
6)
Turn the large FMS Knob to select the AUX Page group on the MFD.
7)
Turn the small FMS Knob to select the System Status Page.
8)
Make sure the SYNC DBS Softkey is in the enabled state.
9)
Monitor the Sync Status in the Database Window, wait for all databases to
complete synching.
10)
Remove and reapply power to the system, select the AUX-System Status
Page, and verify that all databases have been synchronized.
If an error occurs during the synchronization, an error message will be displayed,
followed by the affected display in the Sync Status section of the Database Window.
If a synchronization completes on one display, but an error occurs on another, the
error message will be displayed with the affected diaplay listed after it. When an error
message is displayed, the problem must be corrected before the synchronization can
be completed. A power cycle is required to restart synchronization when ‘Card Full’
or ‘Err’ is shown.
Error Message Description
Canceled An active synchronization has been canceled using the SYNC DBS
Softkey
Card Full SD card does not contain sufficient memory