Effective 4/00
Page 9
IL 33-FX6-1
STEP 6: INSTALLING AND ADJUSTING THE
DTA ASSEMBLY
.266 DIA. (2)
.50
5.00
1.75
C. For Kits Supplied with a Breaker Mounted CPT
Only: Using Drilling Plan “C”, drill two (2) .266"
diameter holes in the left Breaker Frame.
These will be used later in the Retrofit Process
to mount the Breaker Mounted CPT.
Fig. 9: Drilling Plan “B”
Fig. 10: Drilling Plan “C”
.31
.31
3.25
.50
LEFT SIDE
FRONT VIEW
.170 DIA. (2)
Fig. 11 Overview: DTA Installed in the Breaker
A. Align the DTA Assembly with the holes drilled in
Step 5-A. Apply Loc-Tite
®
243 to the threads
of the bolts then secure the DTA Assembly to
the right Breaker Frame, as shown, using the
(2) .250-20 × .500" bolts, (2) lock washers, and
(2) flat washers supplied. Note that the DTA
should be parallel to the edge of the right
Breaker Frame.
When installing the DTA, insure that the Reset
Arm is below the Breaker Cross Bar.
Fig. 12 DTA Mounted to the Breaker Frame