Rolls-Royce 1004227 Automobile User Manual


 
EPRI Proprietary Licensed Material
RB 211 Maintenance Scope
B-6
Rebuild the Module to the Rolls-Royce overhaul specification, fits and clearances etc. and ship
back to the Customer or replace in the ‘POOL’.
05 Module:
Carry out dimension check of IPT Rotor setting.
Inspect the IP Turbine Casing Assembly in the Bulk Condition, including Seal Segments, IP
NGV’s, HP and IP Roller Bearings and Static Abradable Seals.
Inspect the IP Turbine Rotor Assembly in the Bulk condition. Check wear on IP
Turbine blade ‘Z’ notch, turbine disc, shaft, coupling and IPT bearing.
Insure no ‘coking’ in oil scavenge or vent lines in the ‘spider’.
Carry out the following Repair Notes and Overhaul Information Alerts:
RN5018 HP/IP support internal pipe inspection/test
RN5037 IP Turbine Blade inspection criteria
Embody the following modifications:
Mod 1123 Revised vent connection, if required
06 Module:
Visually Inspect all accessories, including Air and Oil Piping, Nose Bullet and P2 Air Filter.
Electrically check Thermocouple Harness.
Remove HP and IP Bleed Valves and Overhaul.
Replace Seals in Davis Valve.
Rebuild
Using the Customers spare 04 Module, rebuild the engine to the Rolls-Royce Overhaul build
specification and fits/clearance limits.