DAMAGE ACTION PROCEDURE FLOWCHART
Rack is damaged
Safety officer to assess and classify
the damage
Red Risk Orange Risk Green Risk
1. Identify damage for repair.
2. Order materials.
3. Ensure all locations
affected by the damage are
not reloaded after the goods
are removed
Record the extent of
the damage and re-
assess at the next
inspection, but,
within 12 months
Immediately off-load
all affected bays of
racking and repair
damage before re-
use.
The necessary
repairs or
replacement of all
damaged parts are
correctly carried
out.
If repairs are
not carried out
within 4 weeks
Repair carried out
If the severity
of the damage
has increased
If there is no change to
the damage level
continue to monitor at
normal inspection levels
and intervals
Continue in service Return to service Return to service