Installation 13
Doc 01-G0610
Rev A
Pad Mount Installation
1 Layout the concrete pad as detailed in Figure
7. Locate the electrical conduit.
Operator cabinet may be installed either
parallel or perpendicular to the fence with
access cover away from fence.
2 Excavate required areas for pad and conduit.
Pad depth should be below the frost line or
as required by local codes.
3 Locate (4) 3/8" x 6" minimum length L-Bolts
(not supplied) as shown in Figure 7.
The L-Bolts should protrude one inch above
the pad.
4 Pour concrete, insuring that pad is level and
above the ground line.
5 Allow concrete to set at least (2) days before
installing power unit.
IMPORTANT NOTE: The relative location of
the operator to the fence and the gate is
critical. Be sure that the measurements for
operator mounting are taken from the
centerline of the fence and of the gate hinge.
6 Bolt the (2) pad mount brackets to the bottom
of the SW420 with the hardware provided.
Refer to Figure 7.
7 After the concrete has set, secure the
operator to the pad.
It is very important that the operator be level
and square to the gate.
8 The L-Bolts should be secured with hex nuts
and lockwashers (not supplied).
The L-Bolts will protrude through the holes in
the mounting brackets.
Hardware
Typ. (6X)
Pad Mount Bracket
01-G610F9
SW420 PAD
PARALLEL MOUNT
Fence Line
Pivot
Gate
18”x30” Pad
Minimum
3/8” L-Bolts
SW420 PAD
PERPENDICULAR MOUNT
Fence Line
Pivot
Gate
Figure 7