LBI-38988 OPERATIONAL CHECKOUT
26 Rev. B
OPERATIONAL CHECKOUT
Verify that the GETC is operating correctly by
performing the following steps:
DIP Switch Settings
Through imporvements in software and hardware,
fewer changes in DIP switch settings are required. As a
result more switch positions are being ignored and their
functionality is being programmed into the GETC via the
Personality Programming.
1. Set the GETC DIP switches S1-1 through S1-7
and S2-1 through S2-4 to the operating frequency.
Refer to SRN1060, Appendix A for wideband
frequencies, and Appendix B for narrow band
frequencies.
NOTE
For MASTR II/IIe (using 349A9607G5 or later)
and MASTR III stations, set DIP switches S1-1
through S1-7 and S2-1 through S2-4 to the
CLOSED position. Frequency is selected via the
Personality programming.
2. Set S1-8 to CLOSED for Satellite Receivers and
Remote Simulcast Site operation. Open for all
other operating modes.
3. Set S2-5 to CLOSED.
4. Set S2-6 to CLOSED enable Conventional Failsoft
or OPEN to disable Conventional Failsoft. With
software 349A9607G4 (or later) set S2-6 to
CLOSED, use Personality Programming.
5. Set S2-7 and S2-8 to CLOSED.
6. Set S3-1 thru S3-5 to the Channel Address. Refer
to Table 8.
7. Set S3-6 to CLOSED.
8. Set S3-7 OPEN for Simulcast or CLOSED for
non-Simulcast. With software 349A9607G4 (or
later) set S2-6 to CLOSED, use Personality
Programming.
9. Set S3-8 to OPEN.
Table 8 - Channel Number Switch Settings
GETC DIP SWITCH
SW-3 SELECTION
(LSB) (MSB)
GETC DIP SWITCH
SW-3 SELECTION
(LSB) (MSB)
CH # 1 2 3 4 5 CH # 1 2 3 4 5
1 OCCC C 13 OCOOC
2COCCC14COOOC
3 OOCC C 15 OOOO C
4 CCOC C 16 CCCC O
5OCOCC17OCCCO
6 COOC C 18 COCC O
7 OOOC C 19 OOCC O
8 CCCO C 20 CCOCO
9OCCOC21OCOCO
10 COCO C 22 COOC O
11 OOCO C 23 OOOC O
12 CCOO C 24 CCCO O
O = open switch position (1)
C = closed switch position (0)
1. Reset the GETC by pressing S4.
2. Complete the verification process for the specific
GETC application, by using the procedure for:
a. A Fully Trunked System
b. A Failsoft System
c. Satellite Site Receiver
Fully Trunked System
Perform the following steps to complete the operational
checkout of a trunked GETC channel moved to the Channel
Test during the Firmware Installation.
1. Verify correct LED indicators for the Trunked
System Control Channel and the idle Working
Channels as shown Table 9.
12345678
S1
12345678
S2
12345678
S3
OPEN OPEN
OPEN
S2-8 Always Closed for
Normal operation, Open for
Test program.
Channel
Number
Figure 8 - Operational DIP Switch Settings
NOTE