16 Remote Power-Off Device — Installation and Quick Start
Configuration and Setup: Set up the Remote Power-Off Device
Remote switch:
requirements
and pin
assignment
Pin locations for
the keystone
jack
Pin locations for
the RJ-11
connector
Type Requirements
RPO/Cascade In
Pin Assignment
Contact
Closure
• Safety Extra Low Voltage
(SELV) or Class 2 circuit
• Switch or relay properly
isolated from the utility
• Latching
2 and 5
Vol tage
Input
• SELV or Class 2 circuit
• Switched 24 V AC/DC
• Latching
3 and 4
1
462
53
2
3
4
5