A SERVICE OF

logo

15
3/8" BOLT
3/8" LOCK WASHER
3/8" WASHER
1/4" DRIVE KEY
CONTROL ARM
OPERATOR
DRIVE SHAFT
CONTROL ARM
EXTENSION
HAND KNOBS FOR MANUAL DISCONNECT
(USE HOLES SHOWN AS STARTING
POSITION)
Figure 2
NOTE:
TO DISCONNECT OPERATOR FOR
MANUAL OPERATION; REMOVE
HAND KNOBS AND SEPARATE
CONTROL ARM EXTENSION FROM
CONTROL ARM.
INSTALLATION INSTRUCTIONS
WARNING: DO NOT APPLY POWER UNTIL
TOLD TO DO SO! RISK OF ELECTRICAL
SHOCK OR INJURY MAY RESULT!
BEFORE INSTALLING OPERATOR
IMPORTANT: Operator should always be mounted
inside the gate. Determine whether the installation is
Left hand or Right hand by the direction the gate
moves in order to open, when viewed from inside the
fence.
LEFT HAND INSTALLATION
RIGHT HAND INSTALLATION
FENCE HINGE
GATE
FENCE
HINGE
GATE
OPERATOR
OPERATOR
Figure 3
1. Gate must swing freely to fully opened and fully
closed position.
2. The operator will be located as shown above, for left
and right hand installation.
16
INSTALLATION LAYOUT
1. Layout mounting post and electrical conduit locations
as shown in figures below. Excavate required area for
conduit installation and cementing of mounting posts.
(Minimum of 2 feet deep, check local codes.)
2. Set mounting post and electrical conduit in place.
3. Pour cement to secure mounting posts and let cure for
two days prior to operator installation.
Note: Distance between mounting posts and relative
location to gate is very important! Operator must be
installed perpendicular to the fence.
18"
GATE HINGE
28"
21-1/2"
17-3/8"
2" O.D. (MOUNTING POST) BY OTHERS
APPROX. 16"
24" MIN.
4" MIN.
GROUND LEVEL
ELECTRICAL CONDUIT
PER LOCAL CODE
CENTER LINE OF FENCE
Figure 4
ELECTRICAL
ACCESS SIDE COVER
ELECTRICAL
CONTUIT