DSGPULW DUOSCREED — OPERATION AND PARTS MANUAL — REV. # 6 (12/10/10) — PAGE 21
DSGPULW DUOSCREED — APPLICATION/OPERATION
Figure 16. DuoScreed Wet Screeding Application
APPROX.
8-9 FT.
HORIZONTAL
DIRECTION
HORIZONTAL
DIRECTION
BLADE OVERLAP
12-18 INCHES
DUOSCREED BLADE
DUOSCREED BLADE
HORIZONTAL
DIRECTION
HORIZONTAL
DIRECTION
12-18 INCH
BASE
TOP RIGHT
CORNER OF
GRID
BLADE OVERLAP
12-18 INCHES
DUOSCREED BLADE
DUOSCREED BLADE
HORIZONTAL
DIRECTION
HORIZONTAL
DIRECTION
HORIZONTAL
DIRECTION
HORIZONTAL
DIRECTION
12-18 INCH
BASE
TOP LEFT
CORNER OF
GRID
STARTING IN THE TOP LEFT CORNER OF GRID,
BUILD 18 INCH WIDE PARALLEL CONCRETE BASES
ACROSS GRADE PINS FROM TOP TO BOTTOM OF GRID.
STEP 4
STARTING IN THE TOP RIGHT CORNER OF GRID,
BUILD 18 INCH WIDE PARALLEL CONCRETE BASES
ACROSS GRADE PINS FROM TOP TO BOTTOM OF GRID.
STEP 6
STEP 1
PLACE # 5 REBAR GRADE PINS
AND FORM RECTANGULAR GRID.
RECTANGULAR
GRID
MAKE 12-18 INCH
BASE (LEFT SIDE)
STEP 3
SET SCREED BLADE DOWN ON
UNFINISHED 8 TO 9 FT. WIDE
MIDDLE SECTION, PLACING
BOTH ENDS OF THE BLADE
ON THE 12-18 INCH BASES.
STEP 7
DUOSCREED BLADE
STEP 5
STEP 7
STEP 7
VERTICAL
DIRECTION
POUR CONCRETE
AND FORM TO GRADE
STEP 2
MAKE 12-18 INCH
BASE (RIGHT SIDE)