4. Putting into op er a tion
»
This chap ter is in tended for op er at ing per son nel.
Pre req ui site for this chap ter is gen eral knowl edge of the op -
er a tion of con vey ing sys tems.
Also pre req ui site for this chap ter is that the func tion ing de -
scrip tion has been read and un der stood.
En sure in each case that the op er at ing per son nel are suf fi -
ciently in formed.
F
Check the com pressed-air sup ply (max. 5-6 bar (72-87 PSI)
sys tem overpressure).
Check the con nec tions of the lines (con vey ing lines and vac -
uum lines).
Check to make sure the col lect ing con tainer is cor rectly in -
serted.
Check the elec tri cal con nec tion.
&
The safety fil ter can only be used to gether with a con vey ing
sys tem.
a536-3MS
SFC-A
Putting into op er a tion 23