QP4TZT10P/TMP16F/TMPXF TRASH PUMP • OPERATION & PARTS MANUAL — REV. #1 (08/29/11) — PAGE 23
MAINTENANCE
ENGINE MAINTENANCE
Perform engine maintenance procedures as referenced by Table 7 below:
Table 7. Engine Maintenance Schedule
DESCRIPTION (3) OPERATION
BEFORE
USE
FIRST
MONTH
OR
1O HRS.
EVERY
3 MONTHS
OR
25 HRS.
EVERY
6 MONTHS
OR
50 HRS.
EVERY
YEAR
OR
100 HRS
EVERY
2 YEARS
OR
200 HRS
Engine Oil CHECK X
CHANGE X
Air Cleaner CHECK X
CHANGE X (1)
All Nuts and Bolts
Retighten if
necessary
X
Cooling Fins CHECK X
Spark Arrester CLEAN X
Fuel Tank CLEAN X
Fuel Filter CHECK X
Idle Speed CHECK-ADJUST X (2)
Valve Clearance CHECK-ADJUST X (2)
Fuel Lines CHECK Every 2 years - replace if necesary (2)
(1) Service more frequently when used in dusty areas.
(2) These items should be serviced by your service dealer, unless you have the proper tools and are mechanically
proficent. Refer to the Hatz shop manual for service procedures.
(3) For commercial use, log hours of operation to determine proper maintenance intervals.
NOTICE
Refer to engine manual for specific servicing instructions.