Frontier Developments RA1110 Automobile User Manual


 
OPERATION Continued
3-POINT HITCH CHECK:
The Riata Rake is equipped for use with Category I and II hitch designs. Be sure the 3-point hitch is
at the proper setting and that the RiataRake is centered and level side to side. Often times the lower
link arms can get out of level, check the side to side level before you engage the tool.
SET UP THE RIATARAKE
Leveling frame:
Use the top link to set the mast and frame angle. The mast of the Riata Rake should be set at 90 de-
grees to the earth in a vertical position. This may vary slightly depending upon arena conditions and
during the use of rippers.
If the mast is vertical, you can be sure that the tine bar is level. This is key to excellent footing. Be
sure that the tines are at the appropriate depth for your arena and equine sport.
3 POINT SETTINGS:
Set 3-point hitch in its “full down” position for normal operating conditions. RiataRake is designed to
oat independently from the tractor. Full down or oat will always produce the best leveling and con-
ditioning.
Never use down draft with RiataRake
Never back your RiataRake unless the implement is raised
completely off the ground by the 3 point hitch.
Never use hydraulic top link with pressure on the RiataRake.
GROUND SPEED:
It is recommended that the machine be operated at 4-6mph. Do not oper-
ate at a speed which will cause the rear comb to come off the surface of
the arena. If this occurs reduce your speed or check to ensure your mast
is vertical.
Operation 20
90°
IMPORTANT
IMPORTANT