Service Procedures: Start-up Site Form
22 InfraStruXure InRow RC
Environment:
Y
es/N
o
1.
Has the Pre Start-up check list been completed?
2.
Is space construction complete?
3.
Is space environment suitable for unit operation?
Temp: Humid:
4.
Is there signs of damage to the RC and or CDU?
5.
If damage was present did the customer file a claim with the shipping
com
p
an
y
for the dama
g
e?
6.
Is there a rack load for proper unit operation?
7.
Has an
y
o
p
en s
p
aces in the rack been covered with blankin
g
p
lates?
8.
Is there sufficient service access for the RC and or CDU?
(Minimum
front access is 36". The CDU needs 36" on both sides as well for
connection to the Chilled Water mains durin
g
installation onl
y)
Front
Access:
Front Access
CDU:
9.
Is there sufficient Unit removal access?
(Minimum removal access
45"
)
?
Front
Access:
Side Access
CDU:
10.
Any components missing? If so list them here with expected ETA.
Description: Qty: Part Number: ETA:
Installation Checks:
Y
es/N
o
1.
Is the system located in the correct position per the CTO report?
2.
Has unit leveling feet been deployed?
3.
Is Unit leveled?
4.
Is Unit properly attached to the rest of the cabinets of the ISX Solution
p
er the installation manual?
(
Document number 990-1945A
)
5.
A
ny internal damage to the unit?
6.
RC has been installed per our Installation documentation?
(Document
number 990-2402
)
7.
Did APC do the installation of the equipment?
8.
If APC did the assembl
y
has an Assembl
y
Site form been com
p
leted?
9.
Does the RC have a RACS (Rack Air Containment System) Attached to
the RC
(
Return or both Return and Su
pp
l
y)
?
10.
Is the RACS installed properly per the Installation manual for the
RACS ?
(Document numbers 990-2643 RACS Overview, 990-2858 RC
return, 990-2859 SX return, 990-2860 RACS end caps, 990-2861 RC
su
pp
l
y
, 990-2863 SX front
)
11.
Is the RC part of a HACS (Hot Aisle Containment System) ?
12.
Is the RC installed into the HACS per the installation manual for the
HACS?
(
Document number 990-1607B
)
13.
Is the CDU installed per the installation manual?
(Document number
990-2823
)
14.
Is the RC and or CDU on a raised floor that can support the operational
weight of the units?
(Operating weight of the RC 400lbs, Operational
wei
g
ht of the CDU is 525lbs
)
15.
All the RC's are across from each other on the Cold Aisle?
(This is
required to prevent discharge air from one RC effecting the Rack inlet
tem
p
erature sensed at the Rack that another RC is bein
g
controlled b
y)
.
16.
The RC's in the Rows sharing a common hot Aisle are across from
each other?
(This is a requirement if HACS is going to be deployed at a
later date
)
.
Mechanical Checks:
Y
es/N
o
1.
is the Chilled Water Piping Top or Bottom feed?
Comments: