
ASSEMBLING AND ADJUSTMENTS
6
–
English
General
Handle
Assemb
ly
T
op handle
Place the handlebar’
s tubular construction in direct
opposite to the lower part of the handlebar. Tighten the
knobs properly.
M46-125,
M46-125R
M40-125
Use enclosed str
aps to secure cables to the handle. Do
not overstretch cables when mounting.
Settings
Handle height (M46-125,
M46-125R)
•
Loosen the lower knobs.
• Adjust the height. Tighten the knobs properly.
Cutting height
Mo
ve the lever to the back for higher cutting height and to
the front for lower cutting height.
M40-125, M46-125 has four controls, one for each wheel.
Catc
her
•
Fit the catcher bag.
• Attach the hooks in the upper edge of the chassis.
• Fit the bagger bottom in the discharge hole.
Mulc
her insert
•
Raise the discharge guard to mount / dismount the
mulch plug.
Hook the spring in the frame.
Filling with oil
•
The oil tank is empty at delivery. Fill the oil slowly. See
instructions under the heading Maintenance. The
engine oil should be changed the first time after 5
hours running time.
!
IMPOR
TANT! Prevent unintentional
starting by removing the ignition cable
from the spark plug.
NO
TICE! Do not set the cutting height too low as there
is a risk that the cutters might hit ground with
unevenness.