A SERVICE OF

logo

21
4.2.3:KLOHDQRWKHUDGXOWKROGVWKH5HDU%HG([WHQVLRQLQSODFHVHFXUHWKHRear Bed
Extension to the back of the Trailer BedXVLQJWKUHH3/8”-16 x 2 3/4” Hex Bolts
(BC)DQGWKUHH3/8”-16 Nylock Nuts (BF).
Note: If necessary, after aligning the holes gently tap the Bolt with a Rubber Mallet
or Hammer to help pass the Bolts through the holes.
BC
BF
4.2.46WDUWLQJDWWKH&RXSOHURQWKH7RQJXHJHQWO\SXOOExcess wire from the back of
the Trailer through the center Conduit and into the Tongue.
4.2.5 Tuck any Excess Wire extending out of the Coupler back underneath the
Coupler and into the Tongue.
Coupler
Wiring Housing
Be careful not to damage the
insulation (colored plastic) around
the wires.
DO NOT COMPLETELY TIGHTEN
THE NYLOCK NUTS YET.