14) INSTALL OPTIONAL HURRICANE TIE-DOWN KIT:
The installer, based on field conditions, will determine the exact location of the tie downs.
As a rule, they should be positioned opposite one another and near the center of ramp as
shown in FIG. 43. (METHOD A, as shown in FIG. 44 is to be used for securing platforms
only.)
The Tie Down Installation Kit meets the requirements of Section 6.0 of ASCE 7-02 (wind
loads) for ensuring that all EZ-ACCESS Ramp systems are properly restrained against
hurricane strength winds.
Install the EZ-ACCESS
®
Modular ramp system ramp system to establish layout and
locations. It may be necessary to temporarily reposition components in order to install
anchor augers.
WARNING: Prior to installing the anchor augers into the ground, ensure that any
underground electrical conductors, natural gas lines, water/drain lines, and/or other
interferences are located and will not hinder the installation.
WARNING: The tie down installation should be completely inspected for any loose
wire ropes, fasteners, anchor augers, etc. after being subjected to strong winds.