Site Preparation Guide
16
Reviewing the Site Preparation Checklist
Lightning protection
√
Determine the mounting location for the lightning rod (positioned near the antenna).
√
Ensure an earth ground location for the antenna structure and lightning arrestor.
Mounting requirements
√
Determine the type of mounting that is required (tripod, wall mount, etc.)
√
Consider that three guy wires are needed for each 10-foot (3 meter) section of the mast;
for example, 20 feet of mast requires six guy wires.
Line of sight
√
Determine the mounting location for the antenna.
√
Ensure that the back of the antenna is clear.
√
Ensure that remote and local antennas can see each other.
√
Ensure that no obstacles are in the direct path or within the defined zone of the two sites.
√
Consider whether any RF interference is present.
Installation Requirements
√
Determine the best location for the Access Point.
√
Determine the length of cable required from the antenna to the Access Point.
√
Ensure the location has an accessible Ethernet connection.
√
Ensure the location has accessible power.
√
Determine the distance between buildings.