A SERVICE OF

logo

Assembly
Step 2: Secure the Upper Lat Tower to the Base
Parts
• CompletedAssembly(fromstep1)
Hardware
• (2)3/8”x4”HexHeadBolts(#5)
• (4)3/8”Washers(#10)
• (2)3/8”Nuts(#11)
Tools
• (2) AdjustableWrenches(notincluded)
2-1 Install the second set of bolts and tighten all of the hardware.
11
10
5
10
Assembly Manual
8