SMC Networks RCS2 Automobile Parts User Manual


 
33
14. Maintenance
14.1 Maintenance Schedule
Perform maintenance work according to the schedule below.
The schedule is set assuming eight hours of operation a day. When the operation time is long such as
24-hour operation, shorten the maintenance intervals as needed.
Visual inspection Grease supply
Start of operation
{
After 1 month of operation
{
After 3 months of operation
{
{ (Sliding surface of the rod) *1
Every 3 months thereafter
{
{ (Sliding surface of the rod) *1
After 3 years of operation, or upon
reaching 5,000 km in traveled distance
{
Every year thereafter
{
*1 Apply grease to the sliding surface of the rod at the startup check if grease has been consumed, or
every three months.
For the RCS2W dustproof/splash-proof type, apply grease when the bellows is changed.
14.2 Visual Inspection of the Machine Exterior
Check the following items visually.
Body Loose mounting bolts?
Cables Damage to cables or connection to connector box?
General Unusual noise or vibrations?
14.3 Cleaning
Clean the exterior as needed.
Wipe off dirt with a soft cloth.
Do not use strong compressed air on the actuator as this may force dust into the crevices.
Do not use petroleum-based solvent on plastic parts or painted surfaces.
If the unit is badly soiled, apply a neutral detergent or alcohol to a soft cloth, and wipe gently.